Stock Code:430508 
| EN
新闻中心banner

ZOSE Cinema began trial operation on June 19th

From:ZOSE Group Publish:2012-06-25

ZOSE Cinema began trial operation on June 19th. After six months of construction, the movie fans of Danzhou can go to the cinema to watch interesting 3D movies and enjoy the comfortable seats, beautiful environment and advanced facilities.


It is reported that the construction area of ZOSE Cinema is 3000 square meters and it is constructed according to the five-star standard. The Cinema is divided into two stairs. The sixth floor is flagship hall and ticket hall, the eighth floor contains 4 professional digital movie halls with 717 seats and 1 VIP room.


The responsible person of ZOSE Cinemas Zhang Yu’an said that the operation of ZOSE Cinema not only provides the best entertainment place for the local people of Danzhou, but also enriches their nightlifes. In the meantime, it changes situation of Danzhou dosen''''t have digital cinema and builds a high-end movie paradise for the fans.


It is said that ZOSE Cinema will have trail operation until July 11th. The audiences can enjoy the half-price ticket during the trial operation period. Besides, ZOSE Cinema will begin official business on July 12th, and then the local people of Danzhou will have chances to watch the latest movies.

Copyright ©2024 Hainan Zose Group ICP:13000627